Home

Plinths accesories

Novorodapie Eclipse - Side cover

165
€5.69
Side cover for LED skirting board made of aluminum for placement as a socket in installations with laminated plasterboard. It allows the installation of an LED lighting strip (Not included) in the interior cavity, giving the profile a double functionality with a high decorative load thanks to the indirect ambient light.
U-shaped stainless steel profile with brushed finish and double perforation. Suitable for fixing and mounting Schluter KERDI-BOARD extruded polystyrene panels. Available in different sizes depending on the thickness of the panel used.  Particularly suitable for visual finishing in partition walls and shelves.
Balcony Profiles

BARA-RW - Dripper L-shaped profile

153
€86.38
L-shaped finishing profile made of stainless steel or colour coated aluminium for the exposed edges of balconies and terraces. The profile produces a visually appealing edge finish and protects the exposed edges of the structural slab from weather and corrosion. 
Plinths accesories

Novorodapie Rehabit - Support Profile

165
€17.92
Support profile for skirting board in aluminum. Easy placement on a pre-existing skirting board. For rehabilitation and reforms.
€9.31
Extruded profile that finishes and protects the edges of tiled coverings, as well as other surfacing materials. For transitions between different surface coverings (e.g. tile to carpet); dado coverings; edge protection at expansion joints; decorative edging for stairs, etc.
€150.56
BARA-RKL is a dripper profile with lacquered aluminum drain. Suitable for large format raised or gravel / gravel tiles.
€175.18
Drainage profile with lacquered aluminum drain openings. It is suitable for laying large raised or gravel / gravel tiles. It has a slot for fixing the Schlüter®-BARIN gutter system.
Product added to wishlist
Product added to compare.

SPECIAL OFFER

From May 29th to June 1st, 2025

10% discount on all products using the coupon: FESTCAN

IMPORTANT NOTICE

Due to the local May holiday, orders placed between May 29th, 2025 and June 1st, 2025 will be processed starting Monday, June 2nd.

We apologize for the inconvenience.